Skip to content
Pilipiknow
2027 DPWH insertions · Rank 58 of 161

+₱377.1M added by the House

33 projects for Pangasinan 4th DEO are in the House-approved 2027 budget but not in the President’s proposal.

Representative(s)

Who represents this district

Maria Rachel Arenas
Maria Rachel Arenas
Pangasinan, 3rd District
View profile
President’s budget (NEP)
₱625.6M
DPWH, this office
House version
₱997.7M
+59% vs NEP
Added projects
33
Value of added projects
₱377.1M
By type

What was added

Road maintenance₱164.5M
10 projects
Flood control₱63M
4 projects
Access roads & bridges₱61M
8 projects
Multi-purpose buildings₱43.5M
9 projects
Bridge widening₱33.8M
1 project
Road rehabilitation₱11.4M
1 project
Every added project

33 projects

Amounts are from the House-approved bill (HB 10858, 3rd reading). The page number points to where the line appears in that volume.

Maramba Br. (B00580LZ) along Sta. Barbara Old Rd
Bridge widening · HB 10858 Vol. I-C, p. 288
₱33.8M
Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱29.9M
Sn Carlos - Calasiao Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱28.3M
Judge Jose De Venecia Sr. Avenue Road
Road maintenance · HB 10858 Vol. I-C, p. 119
₱22.6M
Sn Carlos - Calasiao Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱20.7M
Calasiao Diversion Road, Doña Maria Road, Calasiao
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱20M
Carmen Jct - Bayambang - Manat Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱20M
Slope Protection Structure at San Vicente, Calasiao
Flood control · HB 10858 Vol. I-C, p. 333
₱18M
Slope Protection Structure at Caoayan Bogtong, Malasiqui
Flood control · HB 10858 Vol. I-C, p. 333
₱15M
Slope Protection Structure at Tebag, San Carlos City
Flood control · HB 10858 Vol. I-C, p. 333
₱15M
Rehabilitation of Slope Protection Structure at Salinap, San…
Flood control · HB 10858 Vol. I-C, p. 333
₱15M
Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd
Road rehabilitation · HB 10858 Vol. I-C, p. 158
₱11.4M
Carmen Jct - Bayambang - Manat Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱11.3M
Camiling - Wawa - Bayambang - Malasiqui - Sta. barbara Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱10.8M
Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd (S05942LZ)
Road maintenance · HB 10858 Vol. I-C, p. 129
₱9.6M
Road, Lasip, Malasiqui
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱8M
Road, Bacundao West, Malasiqui
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱8M
Villasis - Malasiqui - Sn Carlos Road
Road maintenance · HB 10858 Vol. I-C, p. 129
₱6.2M
Multi-Purpose Building, Batangcaoa, Bayambang
Multi-purpose buildings · HB 10858 Vol. I-C, p. 690
₱6M
Villasis-Malasiqui-Sn Carlos Rd (S00026LZ)
Road maintenance · HB 10858 Vol. I-C, p. 129
₱5.1M
Road, Apaya, Malasiqui
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱5M
Road, Nalsian, Calasiao
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱5M
Road, Warey, Bayambang
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱5M
Contruction of Local Road, Telbang, Bayambang
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱5M
Road, Cabueldatan, Malasiqui
Access roads & bridges · HB 10858 Vol. I-C, p. 475
₱5M
Multi-Purpose Building, Alinggan-Banaban Elementary School…
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱5M
Multi-Purpose Building, Bocboc, San Carlos City
Multi-purpose buildings · HB 10858 Vol. I-C, p. 690
₱5M
Multi-Purpose Building, Buenlag 1st Elementary School, Bayambang
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱5M
Multi-Purpose Building, Cabueldatan Elementary School, Malasiqui
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱5M
Multi-Purpose Building, Pagal, San Carlos City
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱5M
Multi-Purpose Building, Naguilayan, San Carlos City
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱5M
Multi-Purpose Building, Tanolong National High School, Bayambang
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱5M
Multi-Purpose Building, Amancosiling Sur, Bayambang
Multi-purpose buildings · HB 10858 Vol. I-C, p. 689
₱2.5M

Projects that appear in the House-approved 2027 GAB (3rd reading, HB 10858) but have no matching line in the President's National Expenditure Program (BetterGov trace 'house_only_candidate', excluding repeated keys).

Amending the budget is within Congress’s power, and an added project is not by itself proof of wrongdoing. The Senate and the bicameral conference can still change these amounts.

Source: BetterGov.ph House GAB 2027 tracker. Data as of 2026-11-10.